Testimonials
Dimeo-Avenir project
Dimeo Construction Company
I would like to take this opportunity to extend my appreciation to you and the entire staff at Marr Scaffolding for their dedication and service to the Avenir project located in Boston, Ma. The Avenir project presented many challendes with geometric complexities of the façades and terrace roof surfaces. The Marr and Dimeo teams worked collectively to identify the issues during the preconstruction phase and then Marr and Hydro Mobile applied the engineering knowledge of their mast climber systems to solve the issues during the engineering and layout phases.
From the Marr sales staff right through to the field installation personnel, each phase of the work was executed in an efficient and professional manner. In specific, the attention to detail provided at numerous personalized safety training sessions, conducted by Marr, with on-site trade workers proved to be great testment to the success of the façade installations.
Dimeo Construction Company will look upon the Avenir project in the near futur as a milestne achievement to the portfolio of the work completed in the area. We are pleased to have shared this accomplishment with Marr Scaffolding and look forward to continued success in the future between our two firms.
